Taylor Wimpey were looking for an affordable offsite solution to provide the required number of units within budget and programme utilising as much offsite production as possible.

Taylor Wimpey were looking for an affordable offsite solution to provide the required number of units within budget and programme utilising as much offsite production as possible.
• The decision was taken to use a pre-insulated timber frame external wall system using 100mm PIR insulation.
• The wall system was fitted in a controlled factory environment enabling a high level of quality and for the units to be insulated before the houses were watertight, speeding up 1st and 2nd fix on site and resulting in the houses being completed more quickly.
• One result of the speed of build was a realisation of capital at an earlier stage of the build than previously anticipated.
• Pre-fabricated floor cassettes were delivered from the factory and craned into position providing a higher degree of quality and a safer method of working.
• The fascia and soffits were also fitted by the erect team to enable the roofer to have the houses and apartments watertight immediately.

Latitude is a delightful collection of new 2, 3 & 4 bedroom homes at the heart of the regeneration of Barry Dockland, a vibrant new community close to the seaside, the countryside and excellent transport links by road, rail and air. The Quays will include a host of new local amenities for the area, including waterfront cafés and restaurants, shops including two large supermarkets, a purpose built community facility, a hotel, a brand new primary school, plus new parks and green, open spaces. There’s a 2 year Taylor Wimpey guarantee plus a 10 year NHBC guarantee with every new home.

Stonewood Projects at Cirencester

Case Study

Stonewood Projects at Cirencester

November 5, 2021

Stonewood Projects selected our award-winning Sigma® II build system for their build at Orchard Field, Siddington, Gloucestershire.

Taylor Wimpey at Hemlington

Case Study

Taylor Wimpey at Hemlington

October 8, 2021

An efficient and cost-effective solution to fully supply and install 237 units at their North Yorkshire development

Barratt Lavender Grange, Lower Stondon

Case Study

Barratt Lavender Grange, Lower Stondon

September 28, 2021

Building ahead of schedule to create a community in the village of Lower Stondon

Working with Watford Community Housing

Case Study

Working with Watford Community Housing

September 2, 2021

Former garage sites repurposed as affordable housing

AIMCH

Case Study

AIMCH

August 11, 2021

Innovation Consortium set to modernise how we build homes

The Sigma House 2007

Case Study

The Sigma House 2007

August 11, 2021

In 2007 Stewart Milne Group built the Sigma Home, the first home in the UK designed to Level 5 of the Code…

Press to search

Get in touch