Design Insights: Why Better Starts Earlier is Key

By John Smith, Technical Director, Donaldson Timber Systems
When we talk about offsite construction, the conversation quite often starts with the factory — manufacturing in controlled conditions, improving quality, reducing waste and getting buildings constructed more quickly.
But I’d argue that’s actually starting the conversation too late. The greatest opportunity to get value from offsite happens much earlier - when we’re designing the building, making decisions about structure, materials, interfaces and how everything is going to come together.
So rather than spend the next few minutes talking about the benefits of timber frame, I want to look at what changes when we genuinely design for offsite from the beginning and why that becomes even more important as we start thinking about the carbon embodied in our buildings.
Our technical teams take architectural information and turn it into an engineered timber-frame solution. That becomes coordinated working information, then manufacturing data, then physical components in the factory, and ultimately a building assembled on site. And when you see that complete process repeatedly, one thing becomes very clear. The problems we encounter later are very often consequences of decisions made much earlier. That’s why I want to start with design.
Offsite design changes where work happens
The first thing to recognise is that offsite doesn’t simply change the material we’re building with or move some construction activity into a factory. It changes where the work happens.
With a more traditional construction process, there can be greater opportunity to resolve things as construction progresses on site. Decisions can continue to be made, details adjusted and interfaces dealt with as the building develops. Offsite moves much more of that activity upstream.
Before we manufacture, we need to know what we’re making. The structure needs to be engineered. Openings need to be established. Interfaces need to be coordinated. Dimensions need to be resolved. And the information has to be sufficiently developed to manufacture accurately.
Once something enters production, we’re no longer dealing with a line on a drawing. We’re making a physical component that has to arrive on site and fit with everything around it. So offsite doesn’t remove complexity from construction. It asks us to resolve more of that complexity earlier. And that’s where I think some projects still miss the biggest opportunity.
Early collaboration really matters
I don’t mean simply appointing an offsite manufacturer earlier or asking them for a price earlier. That’s early procurement. It isn’t necessarily early collaboration.
What matters is bringing the different areas of technical knowledge together while there is still an opportunity to influence the building. Architecture, structure, fabric performance, services, manufacture and installation are all connected. Change an opening and there may be a structural consequence. Change a wall build-up and there may be implications for dimensions, thermal performance or interfaces. Change the structural arrangement and that can affect manufacture, logistics or installation. None of those things is unusual. They’re simply part of designing a building. The difference is when we resolve them.
The further a project progresses, the more decisions become fixed and the more expensive or disruptive change can become. So, for me, early collaboration isn’t about giving the timber-frame manufacturer more influence. It’s about giving the project team more options while those options still exist.
And that brings us to an important distinction: there’s a difference between designing a building that can be built offsite and designing a building specifically to get the best from offsite. This distinction is really important.
We regularly see buildings that can absolutely be delivered in timber frame. Technically, we can engineer them and manufacture them. But that’s not the same as saying they’ve been designed to get the best from timber frame. If we’re involved while the design is still developing, we can look at things like grids and spans, openings, load paths, interfaces, repetition and buildability. Sometimes relatively small decisions at that stage can remove complexity later.
It might be rationalising an opening. It might be simplifying a structural arrangement. It might be repeating a detail rather than creating several slightly different versions of essentially the same thing. None of that means allowing the manufacturing process to dictate the architecture.
It’s about understanding the rules and opportunities of the system early enough that the architecture, engineering and manufacturing can work together. And I think there’s an important change of question here. Instead of completing a design and asking ‘Can we make this work in timber frame?’, we should be asking much earlier: ‘How do we design this to get the best from timber frame?’
That’s where DfMA starts to create real value. And one of the areas where that thinking can make a surprisingly big difference is standardisation.
Standardisation
Standardisation is an interesting word in housing, because it can sometimes be interpreted as limiting design. I don’t think that’s what good standardisation should do at all. We carried out an exercise looking at 93 house types across four housebuilders. Across those 93 house types, we found 91 different stair-flight designs.
When we analysed them, we found that we could rationalise that complexity down to just five optimised components. The architecture wouldn’t suddenly become standardised. But behind the finished home, we’ve removed a huge amount of unnecessary variation. And that’s important for offsite manufacture. Every unnecessary variation has to be designed, checked, communicated, manufactured and ultimately installed correctly.
Standardisation gives us the opportunity to repeat what works reducing complexity and creating greater consistency through design, manufacture and construction. So the question shouldn’t be whether we standardise. It should be where standardisation adds value without taking anything away from the design.
We saw the same thing with doors and windows. Across those same 93 house types there were 68 different structural opening sizes, yet the ten most common sizes accounted for 71% of them. And once we’ve resolved and rationalised the design, something else changes. The design stops being simply information about the building, it becomes the information that actually drives manufacture.
Design to manufacture data
Once the design is coordinated, we move into another important part of the offsite process. The design becomes manufacturing data. For every plot, we create the manufacturing design for the walls, floors and roof. From that we generate the information needed to cut materials, manage stock and drive automated production.
So we’re moving from architectural and engineering information into saw files, CAM data and ultimately instructions to manufacturing equipment. And that’s quite an important distinction. In a factory environment, we’re not interpreting the design as we build. We’re manufacturing from information that has already been resolved.
Which means the quality of what comes off the production line is directly connected to the quality and coordination of the information that went into it. Digital precision enables manufacturing precision. And because we’re manufacturing repeatedly in controlled conditions, we can start to create consistency that is much harder to achieve when every element is being constructed individually on site.
The factory doesn’t fix the design. It faithfully manufactures it. But once we have that information, the controlled manufacturing environment gives us another opportunity to change how we think about quality.
Manufacturing environment
The controlled manufacturing environment then changes the way we can approach quality. Quality assurance is obviously important however we build. But ideally, we don’t want to find a problem through inspection and then correct it. We want the process itself to make the problem less likely to occur.
In the factory, we’re working from resolved digital information, using controlled processes, repeatable details and increasingly automated production. We use robotic wall production, automated blown-fibre insulation and laser-assisted manufacturing. But the technology isn’t really the important point.
What matters is what that technology allows us to do: repeat the same process accurately, again and again. And when we combine a coordinated design with a controlled manufacturing process, quality becomes less dependent on individual interpretation or changing site conditions. That’s the real opportunity.
Rather than finding variation at the end of the process, we design more of that variation out at the beginning. Offsite gives us greater control over the variables that influence quality. Accuracy and dimensional consistency are only part of the quality equation. Ultimately, what matters is how the completed building performs.
Performance
And that brings us to performance. We can specify very good individual products. We can select high-performing insulation, design low U-values and set demanding airtightness targets. But buildings don’t perform as a collection of individual products. They perform as a system.
Structure, insulation, airtightness, thermal bridging, junctions, services and interfaces all have to work together. And increasingly, that’s where the technical challenge lies. It isn’t simply achieving a calculated value. It’s making sure the design can be manufactured and assembled consistently enough for the completed building to deliver what we’ve designed.
Offsite gives us an opportunity to resolve more of those interfaces digitally, manufacture critical elements in controlled conditions and repeat proven details across multiple homes. But again, the factory can’t compensate for something that hasn’t been properly coordinated. Performance has to be designed in, manufactured in and then protected through installation. That’s how we start closing the gap between designed performance and delivered performance.
Then we begin to see the benefits on site.
Offsite benefits
This is where we see many of the benefits traditionally associated with offsite construction. We can reduce the number of operations taking place on site. We can erect the structure quickly. We have less exposure to weather during construction, greater predictability, less waste and the opportunity to simplify sequencing for the teams that follow us.
Those are important benefits. But hopefully what I’ve demonstrated is that they don’t begin when the first panel arrives on the back of a lorry. They’re the result of everything that’s happened before that point, early collaboration, coordinated design, engineering, standardisation and controlled manufacture.
Site efficiency is the outcome. It isn’t the starting point. I think that’s an important distinction when we’re deciding how and when to use offsite.
There is another reason why I think the decisions we’re making much earlier in the process are going to become increasingly important.
Carbon
We’ve spent years changing how we design buildings to reduce the energy they use. The next question is whether we’re paying enough attention to the carbon we use to build them in the first place.
We’ve spent a lot of time as an industry reducing operational carbon — and rightly so.
Building Regulations have progressively driven better fabric performance and greater energy efficiency, and the new Future Homes Standard takes that further again, with low-carbon heating and homes designed to become zero carbon in use as the electricity grid decarbonises.
But there’s another part of the carbon equation that isn’t currently addressed in the same way through Building Regulations. The carbon embodied in the building itself.
The materials we specify have to be extracted or grown. They’re processed and manufactured. They’re transported. We use energy constructing the building. Materials may be replaced during its life and eventually the building reaches end of life. All of that has a carbon consequence.
And today, we don’t have a national Building Regulations requirement in England that sets a whole-life embodied-carbon limit for a new home.
So perhaps the next question for us as designers and engineers is: Should we be thinking as carefully about the carbon it takes to create a building as we do about the carbon it takes to operate it?
Because once we start asking that question, some of the decisions we’ve been discussing today take on a completely different significance. Particularly the materials we choose.
And this is where material choice starts to become increasingly important. Every material we put into a building comes with an embodied carbon impact. And the structure can represent a significant proportion of that impact.
So as designers and engineers, one of the questions we increasingly need to ask isn’t simply: will this material do the job? It’s: what is the carbon consequence of choosing it? Timber gives us an interesting opportunity.
Trees absorb carbon dioxide as they grow, and that carbon is stored within the timber when it is used in a building. If that timber comes from responsibly managed forests, we’re also working with a renewable structural resource. Every building needs to be assessed properly. We need to understand quantities, specifications, sourcing, manufacturing, transport, durability and what happens at the end of life. The important change is that carbon becomes part of the design decision.
In the same way that we compare structural performance, thermal performance, cost and buildability, we should increasingly be able to compare the carbon consequences of the choices we’re making. And there’s a connection here to everything I’ve talked about today.
By the time we’re manufacturing the building, many of its embodied-carbon decisions have already been made.
The structural system has been chosen. The materials have largely been specified. The geometry has been established. The quantities are becoming fixed.
So if embodied carbon does become the next major measure of building performance, what might that mean for the way we design homes?
The question is whether we’d make exactly the same design and specification decisions today if embodied carbon carried the same weight as operational carbon. I suspect we wouldn’t.
And that takes me back to where I started. The greatest value from offsite is determined long before anything reaches the factory.
Better design. Better coordination. Better performance. And increasingly, better carbon outcomes. Better starts earlier.